Pre-Start Haggling

My neighbour and I were comparing progress notes the other day. He described the pre-start process as one of “contrived extortion”. What a great term. I am beginning to understand what he means.

When we attended the pre-start process, we were all optimistic, enthusiastic and excited to be finally customising our own house. So we loaded up. Imelda Marcos had less shelves than us in her shoe cupboard. Perth Airport had a scruffier helipad than us. You get the idea. We thought that if the builder was so big and established, then we would get trade costs passed down to us, or get things that were not on display in a Bunnings aisle. How wrong we were.

The Dandy Highwayman I’m not too scared to mention. What’s the point of robbery when nothing is worth taking? (Oh-oh) da diddley qua qua… They don’t make them like that any more. Thankfully. I always thought he chose his stage name after a revelation while visiting my favourite brand of urinal but in fact he thought ‘Adam’ because it was the first man, and ‘Ant’ because after a nuclear holocaust, only the ants will survive. My theory is more likely, I think.

After reviewing our 100K of additional fluff, mostly attributed to the ‘Hamptons’ look, we are now of the opinion that we aren’t going to get any value for money out of the pre-start process. What we have already got though, is the means to research a list of items that we can decide whether to do now or do later. Every variation from ‘Standard, builder’s range’ seems to be costlier than if it was included after handover. Each addition has a secret specification and uplift cost that the builder guards with their trowel, in an attempt to stop us investigating the possibility of doing it ourselves.

Take the cupboard doors for example. Hamptons, of course. 25K for the kitchen alone. 37K if you include the bathrooms, powder and laundry. Just the doors, not the cabinetry. No knobs or handles. These are MDF vinyl-coated doors. The exact sizes are put into a computer, a machine cuts them and another sucks the vinyl onto them. They are white and smooth. They have not been hand inscribed with text from the Rosetta Stone, or individually painted by Michael Angelo.

Michael Angelo is the guy on the Mars advert who has to paint his nude Mum. He didn’t paint the one above, that was an Italian geezer. The one above was hand-painted as well, because rollers hadn’t been invented yet. Actually Michael from the Mars ad didn’t use a roller either. He knew that if you are going to paint your Mum naked, you need a brush to get into all the cracks.

I asked for a breakdown of the estimator’s quotation. Nope, denied – that would show the uplift a little too clearly. So I got out the plans and listed each door shown. I sized each door to the millimetre and costed each one online at e-Kitchens, a WA company specialising in cabinets, frames, doors, drawers and bench tops. A spreadsheet was created and accumulated along the way, making costings easier to compile. The results were astonishing. After cataloguing and costing 54 individual cupboards, drawers and doors, I could hardly believe that the kitchen came out at a mere 6.5K. The other rooms pushed the quote up to 9.6K. So, over 27K less than the builder’s fantasy novel of a quote. Twenty-seven thousand dollars. I could get a wine cellar for that.

The wine cellar that I plan to build under the house. LOL in your dreams, Steve – that’s about as likely as a builder’s discount.

To save 27K, here’s what we would need to do:

  1. Choose the builder’s standard cupboards, drawers and doors, in a standard colour and finish (zero additional cost.)
  2. Wait for the builder to install everything.
  3. Take each item off the hinges.
  4. Number and measure each item.
  5. Send an order online to the kitchen door company.
  6. Receive our shipment, pre-cut, covered and pre-drilled to suit the existing hinges.
  7. Screw everything onto the hinges.
  8. Throw the builder’s stuff in the skip bin.

Judith wants to sell all the old cupboards, but I’ve been looking on gumtree and second-hand kitchen cabinetry is as cheap as chips. I guess we could have a garage sale from our garage with additional non-standard white painted Hamptons look garage door that we paid an extra $1,118 for.

Again, I’m feeling quite the Kryten. But we’ll see how smug I am once I try to screw in my new cabinets and find none of them fit because I’ve measured them up wrong, or they don’t match other colours or textures or smells or auras. Actually, Kryten never said “smug mode engaged” He simply said “Ah, smug mode” and then said he had to get back to his ironing. Stay tuned for more Red Dwarf fun-facts.

We intend to visit kitchen ‘specialists’ and talk to ‘consultants’ today. I’ll let you know how we go. If we like what we see, we might try to apply some trimming elsewhere to get that 100K down even more. Cheers!

4 thoughts on “Pre-Start Haggling”

  1. Maree says:
    20 July 2022 at 2:01 pm

    Oh my God , they are trying to make extra money by charging 3 times the price . They are making back the money they lost due to covid by charging everyone over inflated prices . Unbelievable aren’t they . You better win tattslotto !!

    Reply
    1. Bushmead Admin says:
      20 July 2022 at 2:28 pm

      Yeah, it’s not a good look. And what a waste, too. We’ve just got back from the Kitchen Door people and my estimates seem about right. Even when we factor in about 3K to measure, fit and take away the old ones we’re still paying about 24K less! For the same items! Go figure…

      Reply
  2. SAMANTHA says:
    21 July 2022 at 8:03 pm

    Unbelievable seriously sounds like I may get new cupboards if I dismantle.
    Great !
    Gangsters

    Reply
    1. Bushmead Admin says:
      30 July 2022 at 9:06 am

      @Sam: Yep, come and get them, they’re yours.

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • The Doors are on
  • Onwards Towards Waterproofing – a Roof!
  • Six Months Later, Some Rafters
  • Progress, or Graffiti?
  • Towards Rectification and Reconciliation

Recent Comments

  1. Steve on Lunch
  2. jh on Lunch
  3. Samantha coffey on The Doors are on
  4. Steve on The Doors are on
  5. Chrisso on The Doors are on

Archives

  • July 2024
  • March 2024
  • November 2023
  • October 2023
  • September 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021

Categories

  • Choices
  • Construction
  • Development
  • House Design
  • House Selection
  • Land
  • Preconstruction
©2025 The Bushmead Build | Powered by WordPress and Superb Themes!